011.gif (128 octets)  Index                                                                                 Next  011.gif (128 octets)


Armed Launch - 3. Finishing Outside


  • 1 - Planking the keel
  • 2 - Sanding the hull
  • 3 - Caulking
  • 4 - Dyeing
  • 5 - Varnishing
  • 6 - Drawing the waterline


991.jpg (33276 octets)

011.gif (128 octets) Index                                                                                 Next  011.gif (128 octets)
Copyright © - Hubert Sicard